North Sheltering Breakwater of Kaohsiung Second Harbor Entrance
1.Breakwater: 475m, Caisson about 19 units.
2.Round caisson and Tetrapod removal located at the second port of Kaohsiung south embankment: 14 round caissons and tetrapod removal.
3.Other temporary constructions: including temporary caisson construction dock, construction field, caisson storage field…etc.
2.Round caisson and Tetrapod removal located at the second port of Kaohsiung south embankment: 14 round caissons and tetrapod removal.
3.Other temporary constructions: including temporary caisson construction dock, construction field, caisson storage field…etc.
04
January
2019
Linkou Fossil Power Plant Renewal & Extension Project Basin Dredging at Linkou and Reclamation of Taipei Port South Pier
The dredging area is located in No.139-1, Xiafu, Linkou Dist, New Taipei City (north of Linkou power plant), dredging area is about 148 hectares, and the main reclamation area is located around No.123, Shanggang Rd, Bali Dist, New Taipei City (South terminal of Taipei port and east of C reclamation zone), reclamation area about 52 hectares.
26
October
2018
Seawater Intake Pipe Project of Taiyen Tongxiao Electrodialysis Salt Factory
TongXiao electrodialysis salt factory is currently repairing a Seawater pipeline and connect the end into steel seawater intake pipehead, total length (1,593m).
18
September
2018
Construction Works of Caisson Type Embankment, Dredging-Reclamation and Service Craft Basin for Kaohsiung Intercontinental Container Center(Phase 2)
1.S6~S19 caisson quay: 4418M.
2.Petrochemical oil storage and transport center (dredging and reclamation phase 1):47.2 hectares.
3.Harbor craft basin: 245M.
4.Wave breaker (north revetment).
5.Dredging of 2nd Kaohsiung harbor.
2.Petrochemical oil storage and transport center (dredging and reclamation phase 1):47.2 hectares.
3.Harbor craft basin: 245M.
4.Wave breaker (north revetment).