Results
Projects Completed
21
October
2020
Construction Project of Taichung Port No.36 Wharf
(1) Construction project of 340 meters long Trestle type wharf with planned steel tubular and sheet piles of -16m water depth.
(2) Back yard revetment project of seventh unit of Wharf No.35.
(3) Construction project of pre-piling segment of Wharf No. 37.
(4) Ground improvement with sand compaction piles in wharf area.
(5) Project of public facilities in the wharf area (water supply and drainage, etc.).
(6) The existing revetment rock recovery.
(7) Dredging of the berthing area.
(2) Back yard revetment project of seventh unit of Wharf No.35.
(3) Construction project of pre-piling segment of Wharf No. 37.
(4) Ground improvement with sand compaction piles in wharf area.
(5) Project of public facilities in the wharf area (water supply and drainage, etc.).
(6) The existing revetment rock recovery.
(7) Dredging of the berthing area.
16
June
2020
Construction Project of Four Kun Shen Bulk Cargo Terminal in An-Ping Port.
1.Newly constructed 429meters long steel sheet piles dock with a depth of 12 meters [ including 199 meters long for Pier 18, and 230 meters for Pier 17( including about 32meters gradient section at the end of pier 17 (water depth -7.5 ~ -12.0))]
2.Pier and shore operating area pavement works
3.dew storage Paving Project
4.Public works (roads, water supply, drainage, fire protection, electricity, shore power, lighting ... etc.)
5.dredging and reclamation works (including land preparation for storage area behind piers)
2.Pier and shore operating area pavement works
3.dew storage Paving Project
4.Public works (roads, water supply, drainage, fire protection, electricity, shore power, lighting ... etc.)
5.dredging and reclamation works (including land preparation for storage area behind piers)